DEFINITIVE STUDY AND DETAIL ENGINEERING TO IMPROVE THE INSTALLED CAPACITY OF THE SYSTEM RELIABILITY OF THE CALLEJON DE HUAYLAS AND NORTH CONCHUCOS

  • Pierina – Huaraz 66 kV transmission line, 7 km, single circuit, AAAC 240 mm2 conductor and steel towers.
  • 138 kV interconnection line, 1 km, doublé circuit and steel towers.
  • Derivación new substation 138/66 kV, 30 MVA.
  • Line extension bay 66 kV substation Huaraz (Picup )
  • Implementation of a dorsal fiber-optic net with OPGW
  • System of Telecommunications
  • Elaboration the technical file of the project

 

 

Contracting entity: HIDRANDINA

Location: Ancash - Peru

Period: Mar. 2008 - Set. 2009